VSE TORNADO 2.2. will be available starting from spring 2026.
| Specification | Metric |
|---|---|
| Recommended excavator weight (1)(2) | 1.5–3 ton |
| Bucket capacity (SAE) | 0.07 m³ |
| Operating weight (3) | 150–175 kg |
(1) The maximum operating load permitted for the excavator, when added to the weight of the standard bucket, must match or exceed the weight of the bucket at full load.
(2) User is responsible for ensuring that the equipment meets the excavator’s specifications and weight requirements.
(3) Without mounting bracket.
The VSE TORNADO 3.2 will be available starting from spring 2026.
| Specification | Metric |
|---|---|
| Recommended excavator weight (1)(2) | 2.5–4 ton |
| Bucket capacity (SAE) | 0.09 m³ |
| Operating weight (3) | 190–225 kg |
(1) The maximum operating load permitted for the excavator, when added to the weight of the standard bucket, must match or exceed the weight of the bucket at full load.
(2) User is responsible for ensuring that the equipment meets the excavator’s specifications and weight requirements.
(3) Without mounting bracket.
| Specification | Metric |
|---|---|
| Recommended excavator weight (1)(2) | 3–6 ton |
| Bucket capacity (SAE) | 0.15 m³ |
| Operating weight | 320–370 kg |
(1) The maximum operating load permitted for the excavator, when added to the weight of the standard bucket, must match or exceed the weight of the bucket at full load.
(2) User is responsible for ensuring that the equipment meets the excavator’s specifications and weight requirements.
(3) Without mounting bracket.
| Specification | Metric |
|---|---|
| Recommended excavator weight (1)(2) | 4–7 ton |
| Bucket capacity (SAE) | 0.2 m³ |
| Operating weight (3) | 360–440 kg |
(1) The maximum operating load permitted for the excavator, when added to the weight of the standard bucket, must match or exceed the weight of the bucket at full load.
(2) User is responsible for ensuring that the equipment meets the excavator’s specifications and weight requirements.
(3) Without mounting bracket.
| Specification | Metric |
|---|---|
| Recommended excavator weight (1)(2) | 5–8 ton |
| Bucket capacity (SAE) | 0.3 m³ |
| Operating weight (3) | 415–505 kg |
(1) The maximum operating load permitted for the excavator, when added to the weight of the standard bucket, must match or exceed the weight of the bucket at full load.
(2) User is responsible for ensuring that the equipment meets the excavator’s specifications and weight requirements.
(3) Without mounting bracket.
| Specification | Metric |
|---|---|
| Recommended excavator weight (1)(2) | 6–10 ton |
| Bucket capacity (SAE) | 0.4 m³ |
| Operating weight (3) | 505–620 kg |
(1) The maximum operating load permitted for the excavator, when added to the weight of the standard bucket, must match or exceed the weight of the bucket at full load.
(2) User is responsible for ensuring that the equipment meets the excavator’s specifications and weight requirements.
(3) Without mounting bracket.
VSE TORNADO 2.2. will be available starting from spring 2026.
| Specification | Metric |
|---|---|
| Recommended excavator weight (1)(2) | 1.5–3 ton |
| Bucket capacity (SAE) | 0.07 m³ |
| Operating weight (3) | 150–175 kg |
(1) The maximum operating load permitted for the excavator, when added to the weight of the standard bucket, must match or exceed the weight of the bucket at full load.
(2) User is responsible for ensuring that the equipment meets the excavator’s specifications and weight requirements.
(3) Without mounting bracket.
The VSE TORNADO 3.2 will be available starting from spring 2026.
| Specification | Metric |
|---|---|
| Recommended excavator weight (1)(2) | 2.5–4 ton |
| Bucket capacity (SAE) | 0.09 m³ |
| Operating weight (3) | 190–225 kg |
(1) The maximum operating load permitted for the excavator, when added to the weight of the standard bucket, must match or exceed the weight of the bucket at full load.
(2) User is responsible for ensuring that the equipment meets the excavator’s specifications and weight requirements.
(3) Without mounting bracket.
| Specification | Metric |
|---|---|
| Recommended excavator weight (1)(2) | 3–6 ton |
| Bucket capacity (SAE) | 0.15 m³ |
| Operating weight | 320–370 kg |
(1) The maximum operating load permitted for the excavator, when added to the weight of the standard bucket, must match or exceed the weight of the bucket at full load.
(2) User is responsible for ensuring that the equipment meets the excavator’s specifications and weight requirements.
(3) Without mounting bracket.
| Specification | Metric |
|---|---|
| Recommended excavator weight (1)(2) | 4–7 ton |
| Bucket capacity (SAE) | 0.2 m³ |
| Operating weight (3) | 360–440 kg |
(1) The maximum operating load permitted for the excavator, when added to the weight of the standard bucket, must match or exceed the weight of the bucket at full load.
(2) User is responsible for ensuring that the equipment meets the excavator’s specifications and weight requirements.
(3) Without mounting bracket.
| Specification | Metric |
|---|---|
| Recommended excavator weight (1)(2) | 5–8 ton |
| Bucket capacity (SAE) | 0.3 m³ |
| Operating weight (3) | 415–505 kg |
(1) The maximum operating load permitted for the excavator, when added to the weight of the standard bucket, must match or exceed the weight of the bucket at full load.
(2) User is responsible for ensuring that the equipment meets the excavator’s specifications and weight requirements.
(3) Without mounting bracket.
| Specification | Metric |
|---|---|
| Recommended excavator weight (1)(2) | 6–10 ton |
| Bucket capacity (SAE) | 0.4 m³ |
| Operating weight (3) | 505–620 kg |
(1) The maximum operating load permitted for the excavator, when added to the weight of the standard bucket, must match or exceed the weight of the bucket at full load.
(2) User is responsible for ensuring that the equipment meets the excavator’s specifications and weight requirements.
(3) Without mounting bracket.